How it works

From enquiry to invoice, in one flow.

Follow one real order through Maks Ops. Press any step to watch it.

Test Maks Ops

Acme Engineering Pvt. Ltd. finds the SS304 Mounting Bracket in the public catalogue and asks for 120. The enquiry arrives in Maks Ops as ENQ-0042.

Seven steps. Three phases.

What each step does, and the record it leaves behind.

SellSteps 1–3

Capture the enquiry

From your catalogue or a phone call.

  • Drawings attached
  • Tied to the product
  • No customer record needed
ENQ-0042

Send the quote

Your letterhead, HSN and the right GST.

  • Logo & bank details
  • PDF that prints right
  • Locks once sent
QT-0007

Confirm the order

The accepted quote becomes the order.

  • Lines carried across
  • Stock checked
  • Points back to the quote
CO-0012

Buy and makeSteps 4–6

Buy the material

Vendor quotes read and compared.

  • Excel · PDF · Word
  • Missed lines flagged
  • Original file kept
PFW/FY2026-27/018

Receive the goods

Stock goes up on the receipt itself.

  • Vehicle & batch
  • Short or over, recorded
  • Every movement traced
GRN-00031

Make the parts

Output and scrap give live yield.

  • Bill of materials
  • Scrap counted
  • Cost per piece
PROD-0005

Get paidStep 7

Invoice and get paid

GST from the ship-to. Payment tracked.

  • CGST + SGST or IGST
  • Numbered in sequence
  • Credit & debit notes
INV-0147
The maths

Every invoice, worked out.

The order from the walkthrough, line by line.

Sub-total= Qty × Rate120 × ₹2,320 = ₹2,78,400CGST (9%)= Sub-total × 0.09₹25,056SGST (9%)= Sub-total × 0.09₹25,056Round offto the nearest rupee−₹12CGST + SGST within your state; IGST (18%) when the place of supply is another state.Invoice total= Sub-total + GST ± round off₹3,28,500

Contract work? Running-account bills, with TDS and retention, are in Projects & BOQ.

Run your own order.

No credit card. Every module included.